Yotel Pad Stratford Broadway

Project Description

62 Bed aparthotel

Our Works Included

– Pile Mat installation

– Contiguous Piled Basement Wall and Bearing Piles.

– Underpinning

– Basement Dig

– Installation of foul and surface water drainage.

– Installation of Gas and Waterproofing Membrane system

– Formation of Basement

– Reinforced concrete to Seventh floor slab.

Package Value

£1,473,000.00